Impact of scheduling frequency and shared capacity on production and inventory costs.

Hedenstierna, Carl Philip and Disney, Stephen Michael ORCID: https://orcid.org/0000-0003-2505-9271 2012. Impact of scheduling frequency and shared capacity on production and inventory costs. Presented at: 17th International Working Seminar of Production Economics, Innsbruck, Austria, 20-24 February 2012.

[thumbnail of C98 Impact of scheduling frequency and shared capacity on production and inventory costs.pdf]
Preview
PDF - Accepted Post-Print Version
Download (299kB) | Preview

Abstract

A multi-product production planning problem is considered. Products can either share the same production line, or be produced on different lines. We study the influence of planning cycle length on inventory and production performance, first in terms of how these affect the variability of the states in the production system, and then how this translates into cost. Production costs are assumed to be dominated by labour costs, where we use a model with guaranteed hours and overtime. Inventory performance is measured using holding and backlog costs. The replenishment policy used is the Proportional Order-Up-To (POUT) policy, containing as a special case the classical OUT policy. It does this by having a controllable feedback parameter, which alters the relative dynamics of inventory and capacity. Demand is assumed to be normally, independently and identically distributed. Our analytical results show that there exists an optimal rescheduling frequency that minimises total cost. This frequency is determined by the relationship between the costs and lead time. The economic benefit from planning in larger buckets follows from ‘demand pooling’, which allows more effective use of guaranteed hours and reduces overtime. A balance must be struck between reducing inventory costs, which generally get smaller as we plan more frequently, and labour costs, which increase as we plan more frequently. We also demonstrate that the pursuit of ever-faster rescheduling leads to severe cost penalties. A comparison between the benefits of optimising the rescheduling frequency, production line consolidation, and POUT parameter tuning highlights the economic potential of optimising rescheduling frequency.

Item Type: Conference or Workshop Item (Paper)
Date Type: Completion
Status: Unpublished
Schools: Business (Including Economics)
Centre for Advanced Manufacturing Systems At Cardiff (CAMSAC)
Subjects: H Social Sciences > HD Industries. Land use. Labor
Uncontrolled Keywords: Rescheduling frequency, OUT policy, Inventory and capacity costs, multiple products
Date of First Compliant Deposit: 8 October 2018
Last Modified: 20 Oct 2022 09:57
URI: https://orca.cardiff.ac.uk/id/eprint/33629

Citation Data

Actions (repository staff only)

Edit Item Edit Item

Downloads

Downloads per month over past year

View more statistics