Ren, Guoqian, Li, Haijiang ![]() |
Abstract
Value for money (VfM) as the lifecycle assessment approach in publicprivate partnerships (PPP) essentially covers the overall project performance in both qualitative and quantitative ways. However, the performance measurement in VfM is still lacking supporting data in the project lifecycle. Based on the performance structure of the VfM quantitative assessment, this article developed a data extraction scheme integrated with building information modelling (BIM). The domain of modules mainly covers buildings, civil engineering and highways according to a related measurement standard. By extracting the data types from the original BIM model, the filtered information can facilitate a quantitative assessment by obtaining the required data automatically.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Date Type: | Publication |
Status: | Published |
Schools: | Engineering |
Publisher: | Springer |
ISBN: | 978-3-319-91638-5 |
ISSN: | 0302-9743 |
Last Modified: | 22 Nov 2022 10:17 |
URI: | https://orca.cardiff.ac.uk/id/eprint/112197 |
Citation Data
Cited 2 times in Scopus. View in Scopus. Powered By Scopus® Data
Actions (repository staff only)
![]() |
Edit Item |