Cardiff University | Prifysgol Caerdydd ORCA
Online Research @ Cardiff 
WelshClear Cookie - decide language by browser settings

Exploring systemic factors creating uncertainty in complex engineer-to-order supply chains: case studies from Norwegian shipbuilding first tier suppliers

Alfnes, Erlend, Gosling, Jonathan ORCID: https://orcid.org/0000-0002-9027-9011, Naim, Mohamed M. ORCID: https://orcid.org/0000-0003-3361-9400 and Dreyer, Heidi Carin 2021. Exploring systemic factors creating uncertainty in complex engineer-to-order supply chains: case studies from Norwegian shipbuilding first tier suppliers. International Journal of Production Economics 240 , 108211. 10.1016/j.ijpe.2021.108211

[thumbnail of 1-s2.0-S0925527321001870-main.pdf] PDF - Published Version
Available under License Creative Commons Attribution.

Download (7MB)

Abstract

While it is recognised that there are varying uncertainty characteristics between industry sectors, there is little uncertainty research directly related to engineer-to-order (ETO) systems. A novel method is developed to identify the factors contributing to uncertainty in shipbuilding first-tier suppliers that inhibit the effective and efficient delivery of ETO products. The empirical data set comes from case-specific workshops involving cross-disciplinary staff from engineering, production, purchasing, planning and sales. The protocol included presentations by the researchers and the company, tours of the shopfloor and interactive sessions. The latter used ‘brown-paper’ exercises to map customer penetration-point locations, identify where uncertainties occurred and evaluate their impact-likelihood. The customer penetration-point mapping identified two ETO types; redesign-to-order (RTO) and innovate-to-order (ITO). The major challenges faced by ITO systems are caused through failures in (a) properly understanding customer requirements and translating those to product specification, (b) providing capacity and capability in engineering design teams at both first- and second-tier suppliers, (c) managing interfaces from customer through to second-tier suppliers. Engineering processes in RTO systems have poor customer configuration protocols leading to complex, overengineered products without pre-existing bill of materials. Engineering and production processes at both first- and second-tier RTO suppliers have extended lead-times with poor capacity availability. A change programme is suggested to reduce uncertainty requiring primary consideration of process and control aspects before addressing demand-side and then supply-side changes. The findings are evaluated by independent interviews indicating that the method and tools adopted have validity, and that the findings are commensurate with wider industry expectations.

Item Type: Article
Date Type: Publication
Status: Published
Schools: Business (Including Economics)
Centre for Advanced Manufacturing Systems At Cardiff (CAMSAC)
Additional Information: This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
Publisher: Elsevier
ISSN: 0925-5273
Date of First Compliant Deposit: 20 June 2021
Date of Acceptance: 18 June 2021
Last Modified: 08 Nov 2023 02:33
URI: https://orca.cardiff.ac.uk/id/eprint/142002

Citation Data

Cited 6 times in Scopus. View in Scopus. Powered By Scopus® Data

Actions (repository staff only)

Edit Item Edit Item

Downloads

Downloads per month over past year

View more statistics