Cardiff University | Prifysgol Caerdydd ORCA
Online Research @ Cardiff 
WelshClear Cookie - decide language by browser settings

Engineering management of home-delivery operations through a public-health emergency: retrospective evidence from Kuwait and implications for last-mile preparedness

AlKheder, Sharaf and Aldawish, Abdulaziz 2026. Engineering management of home-delivery operations through a public-health emergency: retrospective evidence from Kuwait and implications for last-mile preparedness. Progress in Disaster Science 32 , 100801. 10.1016/j.pdisas.2026.100801

[thumbnail of 1-s2.0-S2590061726002875-main.pdf] PDF - Published Version
Available under License Creative Commons Attribution.

Download (0B)

Abstract

The COVID-19 pandemic subjected essential urban services to an abrupt stress test, and home delivery, a lifeline service under movement restrictions, is among the clearest cases. This study retrospectively examines that test in Kuwait using order-level records from the courier RZQ (1203 orders sampled on two dates in each of three periods in 2020; 1196 retained in archived regressions), with Aramex summaries as context only. Historical dashboard charts in the original project report, read approximately, show recorded pending-to-completion durations of about 102, 196 and 46 min for January, the April partial curfew and December, with a much smaller change in the chart-labelled on-the-way measure. An archived regression gives a conditional difference of 98.5 min between the April and January dates. These are descriptive historical measures: dashboard denominators cannot be verified, and because the endpoint recorded for cancelled and expired orders is undocumented, successful-delivery times cannot be recovered. An archived survey model is reported for transparency only. The study offers a limited historical baseline and identifies priorities for preparedness monitoring: defined status endpoints, complete stage timestamps and comparable daily coverage. Links to autonomous delivery robots are conceptual; their feasibility was not assessed.

Item Type: Article
Date Type: Publication
Status: Published
Schools: Schools > Engineering
ISSN: 2590-0617
Date of First Compliant Deposit: 25 November 2026
Date of Acceptance: 3 November 2026
Last Modified: 25 Nov 2026 09:46
URI: https://orca.cardiff.ac.uk/id/eprint/191166

Actions (repository staff only)

Edit Item Edit Item

Downloads

Downloads per month over past year

View more statistics