Cardiff University | Prifysgol Caerdydd ORCA
Online Research @ Cardiff 
WelshClear Cookie - decide language by browser settings

Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK

Beach, Thomas ORCID: https://orcid.org/0000-0001-5610-8027, Yeung, Jonathan ORCID: https://orcid.org/0000-0001-6392-5420, Ghoroghi, Ali and Rezgui, Yacine ORCID: https://orcid.org/0000-0002-5711-8400 2024. Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management 10.1080/15623599.2024.2366727

[thumbnail of Moving automated compliance checking to the operational phase of the building life-cycle  analysis and feasibility study in the UK.pdf]
Preview
PDF - Published Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (1MB) | Preview
License URL: http://creativecommons.org/licenses/by-nc-nd/4.0/
License Start date: 10 July 2024

Abstract

Construction regulations ensure a base level of safety of built assets. Formal checking of built assets against regulations happens at defined points in their life-cycle, and often there is limited automation involved. The movement towards digitising and automation elements of physical site inspections paves the way towards a whole life-cycle approach for compliance checking. This paper explores whole life-cycle compliance checking. It does this by extending current checking processes which are common in the design and construction phases into the operational phase of the building life-cycle, proposing that the best way to achieve this is through automated/semi-automated data capture and analysis. To test the feasibility of this concept, this paper will review existing academic literature, analyse existing regulations and conduct proof of concept testing. This paper has found that the concept of whole-lifecycle compliance checking is becoming increasingly important to better monitor and assure high risks elements of the built environment. When applied to the operational phase, it, however, becomes impractical and expensive when relying on solely manual inspections. Furthermore, there is a significant quantity of viable use cases for this approach and that there are viable technologies to leverage them.

Item Type: Article
Date Type: Published Online
Status: In Press
Schools: Engineering
Publisher: Taylor and Francis
ISSN: 1562-3599
Funders: UKRI
Date of First Compliant Deposit: 3 June 2024
Date of Acceptance: 20 May 2024
Last Modified: 03 Sep 2024 08:41
URI: https://orca.cardiff.ac.uk/id/eprint/169454

Actions (repository staff only)

Edit Item Edit Item

Downloads

Downloads per month over past year

View more statistics