Wong, Hartanto Wijaya, Wikner, Joakim and Naim, Mohamed Mohamed ORCID: https://orcid.org/0000-0003-3361-9400 2010. Evaluation of postponement in manufacturing systems with non-negligible changeover times. Production Planning & Control 21 (3) , pp. 258-273. 10.1080/09537280903318781 |
Abstract
This article aims to examine the cost or benefit implications of employing postponement in the manufacturing environments characterised by non-negligible changeover times incurred when switching production from one product to another. Four manufacturing configurations are distinguished based on the choice of manufacturing technology and on whether or not postponement is employed. Analytical evaluation methods based on queuing models are used to assess operational measures for each configuration and solution algorithms are developed to determine the optimal decisions that may include stocking level, batch size and differentiation point. A numerical experiment is carried out to identify how the system performance is affected by different parameters.
Item Type: | Article |
---|---|
Date Type: | Publication |
Status: | Published |
Schools: | Business (Including Economics) Centre for Advanced Manufacturing Systems At Cardiff (CAMSAC) |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HF Commerce H Social Sciences > HG Finance |
Uncontrolled Keywords: | Postponement ; Inventory ; Queuing models ; Changeover/setup. |
Publisher: | Taylor & Francis |
ISSN: | 0953-7287 |
Last Modified: | 19 Oct 2022 08:33 |
URI: | https://orca.cardiff.ac.uk/id/eprint/18207 |
Citation Data
Cited 6 times in Scopus. View in Scopus. Powered By Scopus® Data
Actions (repository staff only)
Edit Item |