Ugalde Loo, Carlos Ernesto ![]() ![]() ![]() |
Official URL: http://dx.doi.org/10.1109/PTC.2011.6019226
Abstract
In Great Britain, increased wind generation, up to 34 GW, is planned. Offshore and onshore infrastructure reinforcements have been proposed, the inland reinforcement including series compensation (fixed capacitors), as discussed in the UK National Grid 2020 Vision. Interaction of series fixed capacitors with the quadrature boosters that are already installed in the GB transmission grid is assessed, with particular emphasis on the occurrence of subsynchronous resonance.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Date Type: | Publication |
Status: | Published |
Schools: | Engineering |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Uncontrolled Keywords: | Phase shifting transformer; power transmission lines; quadrature booster; series compensation; subsynchronous resonance; turbogenerators |
Publisher: | IEEE |
ISBN: | 9781424484195 |
Last Modified: | 20 Oct 2022 09:59 |
URI: | https://orca.cardiff.ac.uk/id/eprint/33783 |
Citation Data
Cited 7 times in Scopus. View in Scopus. Powered By Scopus® Data
Actions (repository staff only)
![]() |
Edit Item |