Kumar, Maneesh ORCID: https://orcid.org/0000-0002-2469-1382, Antony, Jiju and Cho, Byung Rae 2009. Project selection and its impact on the successful deployment of Six Sigma. Business Process Management Journal 15 (5) , pp. 669-686. 10.1108/14637150910987900 |
Abstract
Purpose – The purpose of this paper is to focus on the importance of the project selection process and its role in the successful deployment of Six Sigma within organizations. Design/methodology/approach – A review of the literature is presented, highlighting the importance of project selection in Six Sigma deployment, which is an area of extreme importance that has been less researched in the past. The paper, through a real-life case study, proposes a hybrid methodology, which combines the analytical hierarchy process and the project desirability matrix to select a project for Six Sigma deployment. Findings – The paper demonstrates the efficacy of proposed methodology by its application in a small and medium-sized enterprise (SME) manufacturing die-casting product. The example provided is a real-life case study conducted by the authors in an organization embracing the Six Sigma business strategy within their day-to-day functioning. Research limitations/implications – The proposed methodology is tested only in a case study SME, which is the limitation of the paper. The robustness of the methodology can be tested by conducting several case studies in organizations and comparing the results with other existing methodologies for project selection such as project prioritisation matrix or the failure mode and effect analysis. Practical implications – The paper accentuates the importance of the project selection process for Six Sigma deployment, which can have a tremendous effect on the business profitability of an organization. The paper is relevant to both industry practitioners and researchers. Originality/value – The paper presents a methodology linking the project selection process to successful deployment of Six Sigma within organizations, an important topic that has been neglected in the past. The paper will enable managers and practitioners to emphasize the importance of project selection and to identify and focus on the critical success factors in successful deployment of Six Sigma projects.
Item Type: | Article |
---|---|
Date Type: | Publication |
Status: | Published |
Schools: | Business (Including Economics) Centre for Advanced Manufacturing Systems At Cardiff (CAMSAC) |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Uncontrolled Keywords: | Analytical hierarchy process, Project planning, Six Sigma |
Publisher: | Emerald |
ISSN: | 1463-7154 |
Last Modified: | 21 Oct 2022 09:58 |
URI: | https://orca.cardiff.ac.uk/id/eprint/38555 |
Citation Data
Cited 87 times in Scopus. View in Scopus. Powered By Scopus® Data
Actions (repository staff only)
Edit Item |