Cardiff University | Prifysgol Caerdydd ORCA
Online Research @ Cardiff 
WelshClear Cookie - decide language by browser settings

Combined gas and electricity network expansion planning

Chaudry, Modassar ORCID: https://orcid.org/0000-0002-5577-9790, Jenkins, Nicholas ORCID: https://orcid.org/0000-0003-3082-6260, Qadrdan, Meysam ORCID: https://orcid.org/0000-0001-6167-2933 and Wu, Jianzhong ORCID: https://orcid.org/0000-0001-7928-3602 2014. Combined gas and electricity network expansion planning. Applied Energy 113 , pp. 1171-1187. 10.1016/j.apenergy.2013.08.071

Full text not available from this repository.

Abstract

A combined gas and electricity network expansion planning model was developed. Gas-fired generation plants were considered as linkages between the two networks. The model simultaneously minimises gas and electricity operational and network expansion costs. Additionally it optimally places planned power generation plants around the electricity network. Network expansion was implemented by adding new assets such as pipes, compressors, and storage facilities in the gas network and increasing transmission line capacity in the electricity network. The developed model was used to analyse the GB gas and electricity infrastructure expansion requirements to achieve a low carbon energy system. Two scenarios were implemented, a reference and a low carbon scenario. For both scenarios, CGEN defined a network at lowest cost capable of meeting varying demand and power generation capacity profiles. Greater peak gas demand of approximately 25 mcm/d by 2030 in the reference scenario resulted in CGEN adding an additional 1 Bcm of gas storage capacity compared with the low carbon scenario. LNG gas supplies were shown to account for over 70% of total gas supplies by the end of the time horizon for both scenarios. The combined gas and electricity network planning approach allows analysis into the interactions between these two networks. This interaction allows variables such as total gas supply (gas used for electricity production is an endogenous variable), which 13% higher in the reference scenario and geographic location of gas fired generation to explicitly take account of the impact on both gas and electricity infrastructures.

Item Type: Article
Date Type: Publication
Status: Published
Schools: Engineering
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TD Environmental technology. Sanitary engineering
Uncontrolled Keywords: Gas network; Electricity network; Expansion planning
Publisher: Elsevier
ISSN: 0306-2619
Funders: NERC, UKERC II
Last Modified: 25 Oct 2022 08:38
URI: https://orca.cardiff.ac.uk/id/eprint/53807

Citation Data

Cited 197 times in Scopus. View in Scopus. Powered By Scopus® Data

Actions (repository staff only)

Edit Item Edit Item